Site was split with an existing industrial roadway that ran through the middle of the project site. Traffic was to remain flowing during entire duration of construction and required 4 phases of traffic to allow for construction of the new re-aligned roadway and connect the site driveways. Work proceeded on time and within budget and went without any disruptions to existing businesses that relied on daily deliveries.

Detailed Project Info

  • Earthwork = 145,000 Cubic Yards
  • Fine Grading = 954,000 Square Feet
  • 15-42” Storm Drainage Pipe = 7,600 Lineal Feet
  • 6-10” Roof Drainage Pipe = 2,600 Lineal Feet
  • Storm Drainage Structures = 62 Each
  • Water Quality Units = 2 Each
  • Sanitary Sewer Pipe = 838 Lineal Feet
  • 6-12” Water/Fire Line = 2,300 Lineal Feet